Flagship 2MW data centre for major bank

Completion year 2015

Key People

Nick Stavroulakis

Mechanical Project Engineer, Associate

Ben van Niekerk

Electrical Section Manager, Principal

Bob Vidojevic

Hydraulic Project Engineer, Principal

Show all

WGE are acting as peer review and independent commissioning agent on this flag ship 2MW data centre to ensure:

  • Reliability to Tier 3 standards is seamless
  • Maintainability is straightforward and cost effective
  • Efficiency is maximised to ensure minimal energy wastage

The WGE team are fundamentally de-risking the project, holding the original design to the high standards that the client requires to operate in the financial sector.

Specific project features & WGE involvement:

  • Two x 2MW Tier 3 data centres
  • High efficiency cooling systems have been recommended to achieve very low annualised PUEs, utilising the latest chiller free cooling systems
  • Liaising with authorities to ensure the high energy input to the centres can be achieved
  • Understanding and ensuring the correct requirements for embedded generation are undertaken
  • Attending factoring testing to enable project updates on electrical and mechanical design issues that may arise
  • Attending site during construction to identify defects in a timely manner

Technology sector leader Elliot Alfirevich says that in today’s design and construct era, where projects are bottom line driven, the peer review role adds significant value to ensure design outcomes are met. “Our experience, knowledge of the industry and non-negotiable high work standards has enabled our team to highlight potential project risks before they become problematic,” Elliot says.