Menu

McCullough Robertson Office Fitout

Completion year 2015

Key People

No items found

WGE documented for McCullough Robertson’s new tenancy fitout at Levels 32 and 33 of the MLC Centre, Sydney.

This included the introduction of a new interconnecting stair between the levels which required modifications to the services and updates to the floors fire control systems. A key feature of the fitout is the exposed services, which has given the open office area a more spacious industrial feel. Incorporating surface mounted lights around mechanical ductwork on the slab ceiling was a design challenge overcome by the project team.