Completion year 2015
Key People
Hydraulics Section Manager, Principal
Electrical Project Engineer, Principal
Mechanical Section Manager, Principal
Sustainability Section Manager, Principal
The WGE team worked with Westfield on the base building works to remove the old cinemas and to provide base building services to allow for the fitout of an indoor trampoline centre.
The existing building threw up numerous challenges during both the design and construction period which could have potentially impacted on the architectural intent. WGE worked with Scentre Group Design and Construction teams to ensure these obstacles were overcome and the design intent was achieved successfully.